Mission Summary for June 29, 2004

    This was the second INTEX-A test flight. The main objective was to continue to test instrument performance along with achieving limited scientific objectivies

    GOES-10 ir image (29 Jun 04 20:15 Z) showing DC-8 flight track

    DC-8 tracks on   visible image.
    DC-8 tracks on   water vapor image.