Mission Summary for August 11, 2004

    Objectives: 1. Terra underpass 2. Aqua underpass 3. NA outflow and WCB lifting 4. Frontal crossing and low level pollution

    GOES-12 ir image (11 Aug 04 16:02 Z) showing DC-8 flight track

    DC-8 tracks on   visible image.
    DC-8 tracks on   water vapor image.